Mary Koppes / Petersburg Pilot count
The transfer bridge for the new drive down dock was installed Friday by a large barge-based crane. All but two float sections for the project have arrived and are being bolted together at Tamico's facility in Scow Bay, according to Borough Manager Steve Giesbrecht.
Reader Comments(0)