The city manager presented the following report to the Assembly at Monday’s meeting.
The 30 percent design documents for the Emergency Stand-by Generator (350 kw) replacement have been received from the vendor.
At Crystal Lake, we intend to replace the old “bubbler” lake level indicator system with a new electronic transducer, and add a new air temperature sensor – weather permitting. When complete, we will no longer have to maintain the nitrogen gas system at the lake, and the readings will be much more reliable and accurate.
Spillman Records Management System implementation was completed on...
Reader Comments(0)