Both LeConte & Aurora out of service

JUNEAU – Alaska Marine Highway System (AMHS) was recently informed that the M/V LeConte is in need of more extensive repairs than originally anticipated. AMHS budgeted $1.2 million for overhaul of the 45-year-old LeConte, but after an extensive survey of the steel hull, it was determined that considerable repair work is needed. The additional repairs are estimated to cost $4 million.

Repair work has temporarily stopped on the LeConte. On Nov. 4, AMHS will bring the M/V Aurora into the Vigor shipyard dry-dock in Ketchikan for annual overhaul and survey to determine the extent of repair required...

 

Reader Comments(0)

 
 
Rendered 11/21/2024 12:35