What is wrong with the PMC buildings?
To the Editor:
After reviewing the 50-page 2015 architectural report and visiting with the current Petersburg Medical Center employees, I am sharing my understanding of this issue in two letters.
The hospital consists of three separate constructions: the long-term care, built in 1959 is cement. The acute care building in 1983-84 is steel and wood. The clinic consists of 5 modular sections. They are wood and connected in 1994. The architectural design is amazing with the available space. Renovations include a 2004 change of the nurses’ station, a 2010 clini...
Reader Comments(0)