Harbormaster Glo Wollen (right) watches assembly member Scott Newman (left), Mayor Mark Jensen (middle), and Alaska District Lieutenant Commander Virginia Brickner cut through a longline at the crane dock of South Harbor on May 19 during a ribbon cutting ceremony between the Petersburg Borough and the U.S. Army Corps of Engineers to celebrate the completion of the multi-year South Harbor Dredge Project. The Project deepened and widened the South Harbor basin back to original design depths to improve navigation and optimal use of the facility for generations to come. It was the first dredging o...
Reader Comments(0)